Changing an order’s API can reset its local supplier reference and return it to New. Before proceeding, confirm whether the original supplier already received or charged for the work. A local change does not cancel that external order.
Change the supplier mapping
- Open the order and inspect its API details and activity.
- Choose Change API and select one of the supplier services already configured for this product.
- If needed, edit the product’s Order Automation sources first.
- Review the target service and confirm the change.
- Reload the order and check its connection, supplier service, status and reference.
For Bulk Change API, first filter the processing list to one product and select the intended orders. The action depends on both a product filter and a selection. Review item-level errors; changing one product’s mapping does not prove every selected order changed successfully.
Reference and timeout tools
The order API details can offer Reset Ref. ID or Reset Retry Count. Use the first only after reconciling the supplier’s record; it removes local reference information that normally prevents duplicate sends. Timeout retry reset applies to eligible timed-out, unfinished orders that have a supplier reference. It is not a general reset for completed orders.
Expected result: the order points at the intended mapped supplier service and its next step is deliberate. If a mapping is missing, correct the product sources rather than substituting an unrelated service ID. Retain the previous supplier reference in your approved operational record before a reset.
Related guides
Understand order and supplier statuses Send an order to its supplier or fetch a result